A buyer I know once sent the same bracket drawing to three shops. The quotes came back at ₹18,000, ₹26,000 and ₹31,000. He assumed the cheapest shop had cut corners and the dearest had padded its margin. Neither was true. One shop priced ±0.1 mm, another read the drawing as ±0.02 mm, and the third added anodising the other two had left out.
Same drawing, three different jobs. Most of the price gap in machined parts comes down to tolerance, material and finish. Here is how to settle each one before you send an RFQ.
Ask what the part does before you argue about numbers. A cosmetic cover and a hydraulic manifold shouldn’t carry the same spec. Plenty of drawings reach the shop with ±0.01 mm on every line “to be safe.” That is expensive caution, and the shop prices it in.
Tolerance is how far a dimension may drift from its nominal value. Tighter means slower cutting, more inspection and more scrap, so cost doesn’t rise in a straight line. It climbs.
| Tolerance Band | Typical Range | Where It Belongs | Cost Effect |
| General | ±0.1 mm | Covers, brackets, free surfaces | Baseline |
| Fine | ±0.05 mm | Housings, standard assemblies | Moderate |
| Precision | ±0.01 mm | Bearing seats, shafts, fixtures | High |
| Ultra-fine | ±0.005 mm or less | Medical, aerospace, gauges | Very high |
Tighten only the features that earn it: mating faces, bores, press fits. Everything else can stay general. When you compare quotes for CNC Machining Job Work, ask each supplier which band they actually priced. Otherwise you’re comparing apples with oranges.
Ask what they inspect with, too. A shop promising ±0.01 mm without a CMM or calibrated micrometers is making a hopeful guess, not a promise.
Material drives machinability, tool wear, weight, corrosion life and lead time, and all of it lands in your quote. Aluminium 6061 is the everyday favourite: light, easy to cut and good value, though its surface is soft. Step up to 7075 when you need serious strength for the weight, and accept the higher price and poor weldability. EN8 and EN9 steels suit shafts, gears and pins, but they rust if left bare. Stainless 304 and 316 resist corrosion, yet they work-harden and slow the cutter, which is why stainless quotes surprise first-time buyers. Brass machines beautifully for valves and connectors, though copper price swings move the number. For bushings and wear pads, Delrin, Nylon and PEEK are light and low friction, but they expand with heat.
My rule of thumb: if two grades both meet the performance need, take the one that cuts easier. Free-machining grades can trim cycle time noticeably. In regulated sectors, ask for mill test certificates up front. Chasing paperwork after the parts are made is a miserable exercise.
Finish decides corrosion life and wear resistance, and it changes size. Anodising or plating can add roughly 5 to 25 microns per surface, so a bore that measured perfectly can fail a plug gauge after coating. Always state on the drawing whether the tolerance applies before or after finishing.
The usual options run like this. As-machined is cheapest and fine for hidden parts. Bead blasting gives an even matte look. Anodising protects aluminium, while zinc or nickel plating protects steel (check RoHS needs). Black oxide adds light protection if you keep the part oiled. Powder coating is tough and colourful but wrong for precision faces. Passivation quietly restores the corrosion resistance of stainless steel.
If your assembly also needs brackets, panels or enclosures, a supplier who covers machining plus Sheet Metal Fabrication Chennai buyers rely on can keep coating and colour consistent across parts, with one less handoff to chase.
What tolerance should I use if I’m not sure?
Start at ±0.1 mm for non-critical features and tighten only where function demands it. A good supplier will tell you if something is unrealistic.
Does material really change the price that much?
Yes. Stainless takes longer to cut than aluminium, and the raw stock costs differ too.
Should tolerances include coating thickness?
Say it explicitly. If a dimension must hold after anodising or plating, write that on the drawing.
How do I find local suppliers?
Many Tamil Nadu buyers start by searching Sheet Metal Fabrication Chennai and similar terms, then shortlist on capability, certifications and past work. Ask for sample parts or references before committing.
What’s a fair lead time?
Prototypes usually take 3 to 7 days. Production batches often run 2 to 4 weeks, depending on complexity, finishing and quantity.
Good sourcing isn’t a hunt for the cheapest machinist. It’s tight tolerances only where they matter, a material that suits the job, and a finish planned from day one. Do those three things and CNC Machining Job Work stops being a gamble.
If you’d rather skip the back-and-forth, Indust connects buyers with capable manufacturers so sourcing gets faster, easier and smarter.